exporting construction & agricultural equipment to 80+ countries +86 156 8863 6012 info@mingycn.com
Minimum order1 unit
Lead time20–30 days

120 L Water Tank for Self-Loading Concrete Mixer Truck — Spare Part

Spare part — 120 L on-board water tank for the MY-1500 self-loading concrete mixer truck. Carries the mixing water with the machine, so the pour does not wait for a hose on site.

Model MY-1500

Other

Fits MY-1500 self-loading mixer truck
Material UV-stable plastic

The MY-1500 self-loading concrete mixer truck carries 120 L of mixing water on board, mounted behind the operator station. The tank fills from a standpipe, a bowser or a site tank before the machine leaves, so a self-loading mixer truck arriving at the pour does not wait for a hose to be run out.

What this spare part is called in the trade

These are searched as spare parts, replacement parts, wear parts, or aftermarket parts, and the difference matters: a wear part is bought again every season, a replacement part is bought once when something fails, and an aftermarket part has to match the original fitment exactly. This part is sold on fitment first and price second.

Every part here belongs to the MY-1500 self-loading concrete mixer truck, so the fitment question is specific: drum, water tank, axle, gearbox, hopper or brake assembly for that chassis. Buyers looking for self-loading mixer spare parts, concrete mixer truck replacement parts or a wear part for a 1.5 m³ drum are looking at this list, and the part number is what we quote against.

How the water reaches the mix

Water goes into the drum through the tank outlet while the drum turns, so it mixes into the load instead of pooling at the bottom. On a concrete mixer truck the operator adds by eye against the mix design; the rule on site is less rather than more, because surplus water costs strength and shows up later as a weak pour.

Sizing for a 1.5 m³ batch

120 L covers one 1.5 m³ batch at a water/cement ratio in the normal structural range. For longer runs or dry aggregate, the tank refills from any site supply — it is not a sealed system, and the self-loading mixer truck needs no separate pump or pressure vessel to use it.

Keeping the tank serviceable

The tank is a bolt-on item and the outlet is reachable from the operator side, so a split or a blocked outlet does not mean removing the drum. It is fitted alongside the 1.5 m³ mixer drum and the stainless steel loading hopper on the same self-loading concrete mixer truck.

This water tank is specified for the MY-1500 4WD self-loading mixer. A self loading mixer truck loads, mixes and transports on one chassis, which is what separates a mobile concrete mixer truck from a towed unit that needs a tractor before it can reach the pour. On this 4WD self-loading mixer the part matches a 5,000 kg rated load and a 1.5 m³ drum, so it bolts on without modification.

Questions buyers ask about the water tank

How much water does the tank hold, and is it enough?

120 litres, which is enough to wash down the drum and chute after a pour and to adjust mix consistency on site. It is a working tank rather than a supply tank: on a long pour, refill from a standpipe rather than expecting the tank to last the day.

What happens to the tank in freezing weather?

Drain it. A plastic tank that freezes with water in it splits along the seam, and that is the most common failure we see. The tank is UV-stabilised for summer work; the winter routine is to drain it at the end of the shift, not to add antifreeze.

When the water tank should be replaced

Replace a water tank when it splits at a seam or when the mounting straps have worn through the wall. A cracked tank that still holds water is the one that fails on site, so inspect the seam rather than the body.

Custom builds, OEM and private label

Nothing here is a fixed catalogue part: the working dimensions, the material and the finish are settled at the point of order.

On a spare part that usually means the part number it has to replace, plate thickness and wear grade, the mounting pattern, and how it is packed — a part that does not bolt straight on costs more in downtime than in freight.

  • Fitment: matched to the part number you are replacing
  • Material: plate thickness and wear grade
  • Packing: bulk, pallet, or retail-ready cartons
  • Branding: neutral packing, or your own label

The same applies to parts. We cut to your drawing or to the original part number, pack neutral or under your own label, and hold a batch to one specification so the second shipment matches the first — which matters more on wear parts than on machines, because they are bought again every season. Send us the working condition and the brand you sell under and we will quote the build.

Ask about this machine

We reply within one business day. Your details are never shared.

Tell us the job. We will spec the machine.

Send your working conditions and destination port — you get a costed proposal within one business day.

WhatsApp